What pre-pull actually saves
Two separate meters run against an import container: demurrage while the box sits at the terminal past free time, and per-diem while the ocean carrier's container stays out. Pre-pulling stops the terminal meter and puts the box somewhere you control, so a receiver delay stops being a terminal billing event.
- Container pulled before free time expires
- Stops terminal dwell accumulating
- Delivery on the receiver's schedule
- Empty return handled on our equipment
- Reefer staging with gensets available
- Flexible short- and longer-term yard time